- Documentation requirements
- Permit coordination, design information, installation records, labels, component schedules, photographs, and closeout details can add project administration to the physical work.
- Structural renovation scope
- Combining bays or resizing the opening adds coordination with beam, post, framing, finishing, electrical, design, and municipal requirements outside ordinary door replacement.
- Site exposure
- An open setting, building height, nearby shielding, wall position, and other design inputs can affect the wind criteria supplied for a particular garage opening.